"We tell infrastructure programme managers whether tomorrow's work should go ahead — and why — before the crews leave home."
The night-before decision system for infrastructure sites. One verdict by 20:00: proceed, delay, or cancel — with the full reasoning behind it.
Drop in permits to work, risk assessments, and method statements. Slackwater reads and understands them — extracting every constraint, threshold and uncontrollable factor automatically. No manual data entry.
PERMITS · RISK ASSESSMENTS · WORK PACKSWind speed. Tidal state. Asset status. Permit readiness. CTC clearance. Weather forecast. Each contractor's progress. Updated daily in 5 minutes. Slackwater cross-references everything simultaneously.
REAL-TIME · MULTI-CONTRACTORBy 8pm the night before. A clear PROCEED / DELAY / CANCEL verdict. Exact crew numbers. Task sequence. And the message to send your workforce tonight — so nobody travels for nothing.
NIGHT-BEFORE · HUMAN APPROVEDThe go/no-go decision for constrained infrastructure works is currently made by a programme manager with a phone, a spreadsheet, and a weather app. No software exists to do it systematically. That is Slackwater's uncontested space.
| COMPANY | WHAT THEY SOLVE | WHERE SLACKWATER IS DIFFERENT |
|---|---|---|
| Procore / Autodesk | Office-layer project management — documents, drawings, RFIs | We solve the ground-level operational layer. What happens on site, not in the office. |
| Buildots | Progress tracking via cameras on hard hats. Indoor buildings only. | We solve constraint-governed environments — tidal, weather, regulatory. Entirely different problem. |
| Mastt / Firmus | Pre-construction document and cost management | We operate during delivery — in the shift, not before it starts. |
| Nobody | Go/no-go decision for constrained infrastructure works | This is Slackwater's uncontested space. |
Slackwater doesn't arrive knowing everything. It starts by reading your documents, learning your constraints, and understanding how your specific programme runs. The more operational data you feed it, the more accurate and useful it becomes.
Every task logged. Every tidal window recorded. Every permit tracked. Every delay noted. Over weeks and months, Slackwater builds a model of your programme that no spreadsheet, no generic AI, and no outside consultant could ever replicate — because it was built from what actually happened on your site.
Drop in your permits to work, risk assessments, method statements, lift plans, and work packs. Slackwater reads every one and automatically extracts the constraints, thresholds, and uncontrollable factors that govern your works.
60 seconds at the end of each task. That's all it takes. Log what happened, how long it took, how many people, and any blockers. Over time this becomes the most accurate construction task database ever built — for your specific site, your specific programme.
Every document read. Every task logged. Every condition recorded. Slackwater builds an operational model of your programme that gets more accurate every day — and uses it to tell you what's coming before it becomes a problem.
We're offering a free 90-day trial to one infrastructure site. You provide honest feedback. We build around your operation. No cost. No obligation.